IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0364 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,126 $19,754 Implemented
UF0364 # 03 Y:2005 03 2005 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,567 $94,000 Not Implemented
UF0364 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $572 $852 Not Implemented
UF0364 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $0 Implemented
UF0364 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $979 Not Implemented
UF0364 # 07 Y:2005 07 2005 RECYCLE FLUORESCENT LAMPS $459 $3,496 Not Implemented
UF0364 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,808 $957 Not Implemented
MI0113 # 01 Y:2005 01 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,712 $52,535 Implemented
MI0113 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,230 $435 Implemented
MI0113 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $7,248 $1,138 Not Implemented
MI0113 # 04 Y:2005 04 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $5,163 $17,100 Implemented
MI0113 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $1,868 $975 Not Implemented
MI0112 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $319,237 $91,320 Not Implemented
MI0112 # 02 Y:2005 02 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $89,581 $90 Implemented
MI0112 # 03 Y:2005 03 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $19,066 $8,226 Implemented
MI0112 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,289 $600 Implemented
MI0112 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,504 $1,393 Implemented
MI0111 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,372 $200 Not Implemented
MI0111 # 02 Y:2005 02 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,290 $84 Implemented
MI0111 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,062 $7,706 Implemented
MI0111 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,249 $0 Not Implemented
MI0111 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $873 $1,673 Not Implemented
MI0110 # 01 Y:2005 01 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $122,911 $75,000 Not Implemented
MI0110 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $117,785 $2,470 Not Implemented
MI0110 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $49,464 $16,000 Not Implemented