IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0002 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $123 $96 Implemented
DS0002 # 06 Y:1994 06 1994 USE RADIANT HEATER FOR SPOT HEATING $1,992 $7,200 Implemented
IA0081 # 01 Y:1994 01 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,823 $7,982 Implemented
IA0081 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,535 $6,200 Implemented
IA0081 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,455 $2,215 Implemented
IA0081 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,938 $2,400 Not Implemented
IA0081 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $289 $462 Not Implemented
IA0081 # 06 Y:1994 06 1994 DISCONNECT BALLASTS $201 $494 Implemented
IA0081 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $311 $25 Implemented
IA0081 # 08 Y:1994 08 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $294 $786 Implemented
WI0204 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,288 $10,000 Not Implemented
WI0204 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,124 $500 Implemented
WI0204 # 03 Y:1994 03 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,431 $1,400 Not Implemented
WI0204 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $491 $1,920 Not Implemented
WI0204 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $488 $0 Implemented
WI0204 # 06 Y:1994 06 1994 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $18,227 $66,000 Implemented
WI0204 # 07 Y:1994 07 1994 ELIMINATE/REDUCE AN OPERATION $3,499 $6,000 Not Implemented
TN0514 # 01 Y:1994 01 1994 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $28,698 $23,000 Implemented
TN0514 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $6,641 $2,168 Implemented
TN0514 # 03 Y:1994 03 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $3,001 $1,750 Implemented
TN0514 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13,643 $2,700 Implemented
TN0514 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,520 $0 Not Implemented
SD0079 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,415 $1,020 Not Implemented
SD0079 # 02 Y:1994 02 1994 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $6,933 $5,000 Not Implemented
SD0079 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,210 $50 Not Implemented