IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,413

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0646 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,254 $250 Implemented
SD0646 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,672 $3,061 Not Implemented
SD0646 # 14 Y:2024 14 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,188 $6,972 Not Implemented
SD0646 # 15 Y:2024 15 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,333 $13,388 Not Implemented
AM0897 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $32,420 $45,905 n/a
AM0897 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,400 $32,265 n/a
AM0897 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $4,860 n/a
AM0897 # 04 Y:2024 04 2024 USE PHOTOCELL CONTROLS $520 $102 n/a
AM0897 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $620 $0 n/a
AM0897 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $460 $98 n/a
AM0897 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $300 $22 n/a
AM0897 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $100 n/a
AM0894 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,035 $500 n/a
AM0894 # 02 Y:2024 02 2024 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $735 $1,300 n/a
AM0894 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $670 $790 n/a
AM0894 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $420 $7 n/a
AM0894 # 05 Y:2024 05 2024 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $335 $0 n/a
AM0894 # 06 Y:2024 06 2024 USE SYNTHETIC LUBRICANT $150 $100 n/a
AM0894 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $110 $55 n/a
OK1104 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $89 $0 Not Implemented
OK1104 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,987 $1,552 Not Implemented
OK1104 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $14,088 $189,810 Not Implemented
OK1104 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $179 $580 Not Implemented
IC0293 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $341,931 $2,037,172 Not Implemented
IC0293 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,300 $1,110 Implemented