IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,399

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0047 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $5,148 $906 Not Implemented
NC0046 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $251 $330 Implemented
NC0046 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,179 $6,550 Implemented
NC0046 # 03 Y:1995 03 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $13,396 $12,000 Not Implemented
NC0046 # 04 Y:1995 04 1995 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $18,043 $36,000 Not Implemented
NC0046 # 05 Y:1995 05 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $605 $550 Implemented
NC0046 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $784 $600 Implemented
TN0540 # 01 Y:1995 01 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $5,373 $2,280 Implemented
TN0540 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $4,639 $2,070 Not Implemented
TN0540 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,295 $17,920 Not Implemented
TN0540 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,993 $2,290 Implemented
TN0540 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,361 $0 Not Implemented
TN0540 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,119 $1,845 Not Implemented
NC0045 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,193 $5,730 Not Implemented
NC0045 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,703 $2,581 Not Implemented
NC0045 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,943 $630 Implemented
NC0045 # 04 Y:1994 04 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,312 $720 Not Implemented
NC0045 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $2,490 $210 Not Implemented
NC0045 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,018 $500 Implemented
NC0045 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $29,276 $4,511 Implemented
NC0045 # 08 Y:1994 08 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,341 $3,000 Implemented
NC0044 # 01 Y:1994 01 1994 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $51,000 $30,000 Not Implemented
NC0044 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,164 $45,000 Not Implemented
NC0044 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,742 $13,480 Implemented
NC0044 # 04 Y:1994 04 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,593 $5,000 Not Implemented