Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
906
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0067 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $799 | $5,986 | Not Implemented |
BS0067 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $762 | $77 | Implemented |
BS0067 # 03 Y:2015 | 03 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $473 | $528 | Implemented |
BS0067 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $1,007 | $1,161 | Implemented |
BS0067 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $535 | Implemented |
BS0066 # 01 Y:2015 | 01 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,458 | $568 | Not Implemented |
BS0066 # 02 Y:2015 | 02 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,531 | $26 | Not Implemented |
BS0066 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,219 | $907 | Not Implemented |
BS0066 # 04 Y:2015 | 04 | 2015 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,249 | $80 | Not Implemented |
BS0066 # 05 Y:2015 | 05 | 2015 | COMBINE UTILITY METERS | $258 | $253 | Not Implemented |
BS0066 # 06 Y:2015 | 06 | 2015 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $13,061 | $19,065 | Not Implemented |
BS0066 # 07 Y:2015 | 07 | 2015 | OPTIMIZE PLANT POWER FACTOR | $12,093 | $25,245 | Not Implemented |
BS0066 # 08 Y:2015 | 08 | 2015 | MINIMIZE WATER USAGE | $702 | $5,938 | Not Implemented |
BS0064 # 01 Y:2015 | 01 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,694 | $503 | Implemented |
BS0064 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,555 | $6,149 | Not Implemented |
BS0064 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $98 | $200 | Implemented |
BS0064 # 04 Y:2015 | 04 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,050 | $1,378 | Not Implemented |
BS0064 # 05 Y:2015 | 05 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,284 | $2,208 | Not Implemented |
BS0063 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $260 | $208 | Implemented |
BS0063 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,981 | $3,759 | Not Implemented |
BS0063 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $143 | $357 | Implemented |
BS0063 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,150 | $1,124 | Implemented |
BS0063 # 05 Y:2015 | 05 | 2015 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,476 | $12,265 | Implemented |
BS0063 # 06 Y:2015 | 06 | 2015 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,734 | $2,453 | Not Implemented |
BS0063 # 07 Y:2015 | 07 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,883 | $503 | Implemented |