IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK2005 # 05 Y:2021 05 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,176 $80 n/a
UK2005 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,065 $3,580 n/a
UK2005 # 07 Y:2021 07 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,605 $3,000 n/a
UK2005 # 08 Y:2021 08 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $66,411 $240,000 n/a
UK2005 # 09 Y:2021 09 2021 INSULATE BARE EQUIPMENT $4,993 $6,721 n/a
UK2004 # 01 Y:2020 01 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,031 $21,360 Implemented
UK2004 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,779 $0 Implemented
UK2004 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,067 $2,630 Implemented
UK2004 # 04 Y:2020 04 2020 INCREASE AMOUNT OF CONDENSATE RETURNED $360,000 $250,000 Implemented
UK2004 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $52,668 $24,890 Implemented
UK2004 # 06 Y:2020 06 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $71,487 $150,900 Implemented
UK2004 # 07 Y:2020 07 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $102,672 $4,000 Implemented
UK2004 # 08 Y:2020 08 2020 ELIMINATE A BY-PRODUCT $293,614 $53,800 Not Implemented
UK2004 # 09 Y:2020 09 2020 OPTIMIZE PLANT POWER FACTOR $40,258 $23,660 Implemented
UK2003 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $2,200 Not Implemented
UK2003 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $660 $0 Not Implemented
UK2003 # 03 Y:2020 03 2020 REDUCE VENTILATION AIR $5,372 $4,560 Not Implemented
UK2003 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $4,628 $1,586 Implemented
UK2003 # 05 Y:2020 05 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,645 $28,100 Implemented
UK2003 # 06 Y:2020 06 2020 OPTIMIZE PLANT POWER FACTOR $10,287 $6,825 Not Implemented
UK2003 # 07 Y:2020 07 2020 MINIMIZE WATER USAGE $27,840 $15,000 Implemented
UK2002 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $2,473 Implemented
UK2002 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $473 $160 Implemented
UK2002 # 03 Y:2020 03 2020 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $800 $0 Not Implemented
UK2002 # 04 Y:2020 04 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $460 $0 Not Implemented