IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1053 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,100 $201,500 Not Implemented
UD1053 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,097 $110,000 Implemented
UD1053 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $7,370 $110,000 Implemented
UD1053 # 09 Y:2023 09 2023 OPTIMIZE PLANT POWER FACTOR $46,233 $119,156 Not Implemented
CW0126 # 01 Y:2022 01 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,675 $20,960 n/a
CW0126 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $12,461 $15,547 n/a
CW0126 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $361 $0 n/a
CW0126 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,047 $54,963 n/a
CW0126 # 05 Y:2022 05 2022 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $10,872 $33,000 n/a
CW0126 # 06 Y:2022 06 2022 USE POWER DURING OFF-PEAK PERIODS $921 $0 n/a
CW0126 # 07 Y:2022 07 2022 USE SOLAR HEAT FOR HEAT $2,171 $13,500 n/a
IP0169 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,807 $69 Implemented
IP0169 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,007 $0 Implemented
IP0169 # 03 Y:2023 03 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $141 $0 Implemented
IP0169 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,581 $1,991 Implemented
IP0169 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,451 $478 Implemented
IP0169 # 06 Y:2023 06 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,069 $1,503 Implemented
IP0169 # 07 Y:2023 07 2023 USE RADIANT HEATER FOR SPOT HEATING $1,642 $661 Implemented
IP0169 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,155 $837 Implemented
IP0169 # 09 Y:2023 09 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $786 $679 Implemented
IP0169 # 10 Y:2023 10 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,071 $15,432 Implemented
IP0169 # 11 Y:2023 11 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,267 $5,079 Implemented
IP0169 # 12 Y:2023 12 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,942 $9,196 Not Implemented
IP0169 # 13 Y:2023 13 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,020 $7,379 Implemented
IP0169 # 14 Y:2023 14 2023 DISCONNECT BALLASTS $7 $20 Implemented