Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1053 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $95,100 | $201,500 | Not Implemented |
UD1053 # 07 Y:2023 | 07 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,097 | $110,000 | Implemented |
UD1053 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $7,370 | $110,000 | Implemented |
UD1053 # 09 Y:2023 | 09 | 2023 | OPTIMIZE PLANT POWER FACTOR | $46,233 | $119,156 | Not Implemented |
CW0126 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,675 | $20,960 | n/a |
CW0126 # 02 Y:2022 | 02 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $12,461 | $15,547 | n/a |
CW0126 # 03 Y:2022 | 03 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $361 | $0 | n/a |
CW0126 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,047 | $54,963 | n/a |
CW0126 # 05 Y:2022 | 05 | 2022 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $10,872 | $33,000 | n/a |
CW0126 # 06 Y:2022 | 06 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $921 | $0 | n/a |
CW0126 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT FOR HEAT | $2,171 | $13,500 | n/a |
IP0169 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,807 | $69 | Implemented |
IP0169 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,007 | $0 | Implemented |
IP0169 # 03 Y:2023 | 03 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $141 | $0 | Implemented |
IP0169 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,581 | $1,991 | Implemented |
IP0169 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,451 | $478 | Implemented |
IP0169 # 06 Y:2023 | 06 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,069 | $1,503 | Implemented |
IP0169 # 07 Y:2023 | 07 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $1,642 | $661 | Implemented |
IP0169 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,155 | $837 | Implemented |
IP0169 # 09 Y:2023 | 09 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $786 | $679 | Implemented |
IP0169 # 10 Y:2023 | 10 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,071 | $15,432 | Implemented |
IP0169 # 11 Y:2023 | 11 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,267 | $5,079 | Implemented |
IP0169 # 12 Y:2023 | 12 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,942 | $9,196 | Not Implemented |
IP0169 # 13 Y:2023 | 13 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,020 | $7,379 | Implemented |
IP0169 # 14 Y:2023 | 14 | 2023 | DISCONNECT BALLASTS | $7 | $20 | Implemented |