IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,821

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0850 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,844 $1,000 Implemented
MA0850 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,345 $8,021 Not Implemented
MA0850 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $589 $625 Not Implemented
LS1123 # 01 Y:2023 01 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,082 $150 Implemented
LS1123 # 02 Y:2023 02 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,809 $300 Implemented
LS1123 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,349 $1,730 Implemented
LS1123 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $79 $75 Implemented
LS1123 # 05 Y:2023 05 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,321 $2,881 Implemented
WM0189 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,963 $75,000 Not Implemented
WM0189 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,780 $20,906 Not Implemented
WM0189 # 03 Y:2023 03 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $4,948 $15,600 Implemented
WM0189 # 04 Y:2023 04 2023 COMBINE UTILITY METERS $2,274 $0 Implemented
WM0189 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,529 $2,900 Not Implemented
WM0189 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $873 $5,496 Implemented
WM0189 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $2,500 Implemented
WM0189 # 08 Y:2023 08 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $614 $880 Not Implemented
SD0626 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $54,888 $228,599 Not Implemented
SD0626 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,022 $3,456 Not Implemented
SD0626 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,114 $4,352 Not Implemented
SD0626 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,642 $5,868 Not Implemented
SD0626 # 05 Y:2023 05 2023 MODIFY STARTUP/SHUTDOWN TIMES $90,974 $2,500 Not Implemented
SD0626 # 06 Y:2023 06 2023 MODIFY STARTUP/SHUTDOWN TIMES $87,191 $2,500 Not Implemented
SD0625 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,326 $408,646 Not Implemented
SD0625 # 02 Y:2023 02 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $868 $4,212 Not Implemented
SD0625 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $348 $1,355 Not Implemented