IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0007 # 08 Y:1993 08 1993 INSTALL TURBULATORS $8,700 $1,500 Implemented
NC0007 # 09 Y:1993 09 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,500 $200 Not Implemented
NC0009 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,251 $252 Implemented
NC0009 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,879 $540 Implemented
NC0009 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,131 $4,459 Not Implemented
NC0009 # 04 Y:1993 04 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,400 $960 Implemented
NC0009 # 05 Y:1993 05 1993 AIR CONDITION ONLY SPACE NECESSARY $2,858 $2,000 Not Implemented
NC0009 # 06 Y:1993 06 1993 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,408 $0 Implemented
NC0009 # 07 Y:1993 07 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,960 $2,000 Not Implemented
NC0010 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,824 $11,100 Implemented
NC0010 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $844 $1,850 Implemented
NC0010 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,352 $7,886 Not Implemented
NC0010 # 04 Y:1993 04 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,682 $11,000 Not Implemented
NC0010 # 05 Y:1993 05 1993 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,968 $0 Not Implemented
NC0010 # 06 Y:1993 06 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $278 $0 Implemented
NC0011 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,817 $2,928 Not Implemented
NC0011 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,210 $21,960 Not Implemented
NC0011 # 03 Y:1993 03 1993 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $7,188 $1,760 Implemented
NC0011 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $1,200 Implemented
NC0011 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,033 $510 Implemented
NC0011 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,045 $300 Implemented
NC0005 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,001 $1,477 Implemented
NC0005 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,369 $7,480 Not Implemented
NC0005 # 03 Y:1993 03 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,496 $1,800 Implemented
NC0005 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,174 $13,550 Implemented