IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0004 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,514 $1,222 Implemented
NC0004 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $690 Implemented
NC0004 # 03 Y:1993 03 1993 RECOVER AND REUSE COOLING WATER $834 $500 Not Implemented
NC0004 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $26,384 $1,500 Not Implemented
NC0004 # 05 Y:1993 05 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,143 $1,100 Not Implemented
NC0004 # 06 Y:1993 06 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,494 $4,500 Not Implemented
NC0001 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,139 $1,577 Not Implemented
NC0001 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,100 $500 Implemented
NC0001 # 03 Y:1993 03 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $745 $300 Implemented
NC0001 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $588 $10 Implemented
NC0001 # 05 Y:1993 05 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $162 $100 Implemented
NC0001 # 06 Y:1993 06 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,120 $4,800 Not Implemented
TN0440 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $23,728 $710 Not Implemented
TN0440 # 02 Y:1991 02 1991 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,819 $0 Not Implemented
TN0440 # 03 Y:1991 03 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,084 $7,500 Not Implemented
TN0440 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,173 $1,480 Not Implemented
TN0440 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $2,953 $1,380 Not Implemented
TN0430 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $27,754 $8,700 Not Implemented
TN0430 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $23,175 $2,472 Not Implemented
TN0430 # 03 Y:1991 03 1991 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $13,212 $7,325 Not Implemented
TN0430 # 04 Y:1991 04 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,321 $0 Not Implemented
TN0430 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,938 $2,450 Not Implemented
TN0430 # 06 Y:1991 06 1991 INSTALL SET-BACK TIMERS $1,526 $0 Not Implemented
TN0430 # 07 Y:1991 07 1991 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $1,477 $0 Not Implemented
TN0430 # 08 Y:1991 08 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,412 $620 Not Implemented