Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0004 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,514 | $1,222 | Implemented |
NC0004 # 02 Y:1993 | 02 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $690 | Implemented |
NC0004 # 03 Y:1993 | 03 | 1993 | RECOVER AND REUSE COOLING WATER | $834 | $500 | Not Implemented |
NC0004 # 04 Y:1993 | 04 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $26,384 | $1,500 | Not Implemented |
NC0004 # 05 Y:1993 | 05 | 1993 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,143 | $1,100 | Not Implemented |
NC0004 # 06 Y:1993 | 06 | 1993 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,494 | $4,500 | Not Implemented |
NC0001 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,139 | $1,577 | Not Implemented |
NC0001 # 02 Y:1993 | 02 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,100 | $500 | Implemented |
NC0001 # 03 Y:1993 | 03 | 1993 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $745 | $300 | Implemented |
NC0001 # 04 Y:1993 | 04 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $588 | $10 | Implemented |
NC0001 # 05 Y:1993 | 05 | 1993 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $162 | $100 | Implemented |
NC0001 # 06 Y:1993 | 06 | 1993 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,120 | $4,800 | Not Implemented |
TN0440 # 01 Y:1991 | 01 | 1991 | INSULATE BARE EQUIPMENT | $23,728 | $710 | Not Implemented |
TN0440 # 02 Y:1991 | 02 | 1991 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $3,819 | $0 | Not Implemented |
TN0440 # 03 Y:1991 | 03 | 1991 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,084 | $7,500 | Not Implemented |
TN0440 # 04 Y:1991 | 04 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,173 | $1,480 | Not Implemented |
TN0440 # 05 Y:1991 | 05 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $2,953 | $1,380 | Not Implemented |
TN0430 # 01 Y:1991 | 01 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $27,754 | $8,700 | Not Implemented |
TN0430 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $23,175 | $2,472 | Not Implemented |
TN0430 # 03 Y:1991 | 03 | 1991 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $13,212 | $7,325 | Not Implemented |
TN0430 # 04 Y:1991 | 04 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,321 | $0 | Not Implemented |
TN0430 # 05 Y:1991 | 05 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,938 | $2,450 | Not Implemented |
TN0430 # 06 Y:1991 | 06 | 1991 | INSTALL SET-BACK TIMERS | $1,526 | $0 | Not Implemented |
TN0430 # 07 Y:1991 | 07 | 1991 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $1,477 | $0 | Not Implemented |
TN0430 # 08 Y:1991 | 08 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,412 | $620 | Not Implemented |