IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0253 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,274 $9,590 Not Implemented
SF0253 # 04 Y:2003 04 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,627 $50,000 Not Implemented
SF0253 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,369 $9,627 Not Implemented
UF0315 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,085 $353 Implemented
UF0315 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,831 $4,121 Implemented
UF0315 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $903 $3,000 Not Implemented
UF0315 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,378 $0 Not Implemented
UF0315 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,039 $1,906 Implemented
UF0315 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $3,905 $1,281 Not Implemented
UF0315 # 07 Y:2003 07 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $14,685 $20,500 Not Implemented
UF0315 # 08 Y:2003 08 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,301 $260 Implemented
UF0315 # 09 Y:2003 09 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,266 $1,895 Not Implemented
BD0228 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,709 $1,500 Not Implemented
BD0228 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,906 $1,300 Implemented
BD0228 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $3,014 $900 Not Implemented
BD0228 # 04 Y:2003 04 2003 USE RADIANT HEATER FOR SPOT HEATING $1,666 $3,000 Not Implemented
BD0228 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $959 $0 Not Implemented
BD0228 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $1,500 Not Implemented
BD0228 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107 $295 Not Implemented
BD0228 # 08 Y:2003 08 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $454 $860 Not Implemented
BD0228 # 09 Y:2003 09 2003 MINIMIZE WATER USAGE $692 $690 Not Implemented
BD0228 # 10 Y:2003 10 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,250 $1,000 Not Implemented
AS0344 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,169 $6,136 Implemented
AS0344 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $512 $5,250 Not Implemented
AS0344 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,587 $10,835 Implemented