IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0087 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,075 $40 Not Implemented
UF0347 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,948 $9,014 Not Implemented
UF0347 # 02 Y:2004 02 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,683 $24,500 Not Implemented
UF0347 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,477 $23,746 Not Implemented
UF0347 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,920 $1,902 Not Implemented
UF0347 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,256 $0 Not Implemented
UF0347 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,861 $0 Not Implemented
UF0347 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,852 $1,004 Not Implemented
UF0347 # 08 Y:2004 08 2004 ADD AREA LIGHTING SWITCHES $1,051 $3,395 Not Implemented
UF0347 # 09 Y:2004 09 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,746 $800 Not Implemented
UF0346 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $12,968 $5,044 Not Implemented
UF0346 # 02 Y:2004 02 2004 INSTALL SKYLIGHTS $3,241 $8,578 Not Implemented
UF0346 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $908 $5,504 Implemented
UF0346 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $942 $210 Implemented
UF0346 # 05 Y:2004 05 2004 CONVERT TO ROBOTIC PAINTING $24,976 $124,000 Not Implemented
MI0086 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $21,915 $2,300 Implemented
MI0086 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,200 $2,300 Implemented
MI0086 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $792 $80 Implemented
MI0086 # 04 Y:2004 04 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $90,000 $50,000 Implemented
MI0086 # 05 Y:2004 05 2004 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $120 $15 Not Implemented
MI0086 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,490 $610 Implemented
MI0086 # 07 Y:2004 07 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $340 $386 Implemented
MI0086 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,615 $490 Implemented
UF0345 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,479 $18,128 Implemented
UF0345 # 02 Y:2004 02 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $9,242 $24,500 Implemented