Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2005
Principal Product Fire Truck Parts
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 41
Plant Area (Sq.Ft.) 98,500
Annual Production 10,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,938 1,288,087 kWh $0.07
Electricity Demand $30,644 4,534 kW-months/year $6.76
TOTAL ENERGY COSTS $116,582
RECOMMENDED SAVINGS* $19,832 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,262
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,460
Cost:
$65,755
$9,577 142,939 $2,883 36 - - $9,577
142,939
kWh
$2,883
36
kW-months/year
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,558
Cost:
$1,105
$2,558 38,181 - - - - $2,558
38,181
kWh
-
-
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,371
Cost:
$1,560
$1,498 22,364 $873 11 - - $1,498
22,364
kWh
$873
11
kW-months/year
-
-
lb
04: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$571
Cost:
$2,910
$571 8,518 - - - - $571
8,518
kWh
-
-
kW-months/year
-
-
lb
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$448
Cost:
-
$182 2,719 $266 3 - - $182
2,719
kWh
$266
3
kW-months/year
-
-
lb
06: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
$1,424
Cost:
$3,496
- - - - $1,424 - -
-
kWh
-
-
kW-months/year
$1,424
-
lb
TOTAL RECOMMENDED Savings:
$19,832
Cost:
$74,826
$14,386 214,721 $4,022 50 $1,424 - $14,386
214,721
kWh
$4,022
50
kW-months/year
$1,424
-
lb
TOTAL IMPLEMENTED Savings:
$19,262
Cost:
$71,916
$13,816 206,203 $4,022 50 $1,424 - $13,816
206,203
kWh
$4,022
50
kW-months/year
$1,424
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)