IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0325 # 05 Y:1990 05 1990 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $32,480 $60,000 Not Implemented
UD0325 # 06 Y:1990 06 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,978 $20,000 Implemented
UD0326 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,550 $3,000 Not Implemented
UD0326 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,372 $0 Implemented
UD0326 # 03 Y:1990 03 1990 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,745 $0 Not Implemented
UD0327 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $14,606 $12,000 Implemented
UD0327 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $49,772 $3,000 Implemented
UD0327 # 03 Y:1990 03 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,063 $1,000 Not Implemented
UD0327 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-1,479 $540 Implemented
UD0327 # 05 Y:1990 05 1990 INSTALL TIMERS AND/OR THERMOSTATS $962 $600 Not Implemented
UD0322 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $6,882 $27,000 Implemented
UD0322 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,776 $585 Implemented
UD0322 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $1,497 $90 Implemented
UD0323 # 01 Y:1990 01 1990 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,239 $0 Not Implemented
UD0323 # 02 Y:1990 02 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,073 $300 Not Implemented
UD0323 # 03 Y:1990 03 1990 RECOVER AND REUSE COOLING WATER $1,984 $300 Not Implemented
UD0323 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,470 $3,000 Not Implemented
UD0323 # 05 Y:1990 05 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,821 $23,000 Not Implemented
UD0323 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,979 $16,000 Implemented
UD0324 # 01 Y:1990 01 1990 TURN OFF EQUIPMENT WHEN NOT IN USE $250 $0 Implemented
UD0324 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,881 $575 Implemented
UD0324 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $601 $100 Not Implemented
UD0324 # 04 Y:1990 04 1990 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,025 $0 Implemented
UD0324 # 05 Y:1990 05 1990 INSTALL TIMERS AND/OR THERMOSTATS $3,107 $2,000 Not Implemented
UD0308 # 01 Y:1990 01 1990 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $13,703 $1,500 Not Implemented