IAC logo
IAC Assessment: ND0023
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0023
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1992
Principal Product REFRACTORY BRICK
NAICS n/a
SIC 3297 - Nonclay Refractories
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 38,000 Tons
Production Hrs. Annual 8,736
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $457,560 6,703,693 kWh $0.07
Natural Gas $702,842 264,768 MMBtu $2.65
TOTAL ENERGY COSTS $1,160,402
RECOMMENDED SAVINGS* $41,834 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,775
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,750
Cost:
$15,200
$2,750 41,618 - - - - $2,750
41,618
kWh
-
-
MMBtu
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,216
Cost:
$320
$12,216 179,074 - - - - $12,216
179,074
kWh
-
-
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$15,791
Cost:
$15,000
$15,791 231,536 - - - - $15,791
231,536
kWh
-
-
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,052
Cost:
$6,780
$8,052 - - - - - $8,052
-
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,729
Cost:
$3,400
- - $2,756 1,040 $(-27) - -
-
kWh
$2,756
1,040
MMBtu
$(-27)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$296
Cost:
$800
$418 6,155 - - $(-122) - $418
6,155
kWh
-
-
MMBtu
$(-122)
-
$
TOTAL RECOMMENDED Savings:
$41,834
Cost:
$41,500
$39,227 458,383 $2,756 1,040 $(-149) - $39,227
458,383
kWh
$2,756
1,040
MMBtu
$(-149)
-
$
TOTAL IMPLEMENTED Savings:
$5,775
Cost:
$19,400
$3,168 47,773 $2,756 1,040 $(-149) - $3,168
47,773
kWh
$2,756
1,040
MMBtu
$(-149)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes