IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK2002 # 05 Y:2020 05 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $17,165 $0 Implemented
UK2001 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,076 $2,010 Implemented
UK2001 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,413 $0 Not Implemented
UK2001 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,887 $9,378 Implemented
UK2001 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $571 $875 Implemented
UK2001 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,684 $2,240 Not Implemented
UK2001 # 06 Y:2020 06 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $118,102 $6,775 Not Implemented
UK2001 # 07 Y:2020 07 2020 CLEAN CONDENSER TUBES $4,023 $8,700 Implemented
UK2001 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $2,547 $1,006 Not Implemented
UK2001 # 09 Y:2020 09 2020 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $252,728 $102,800 Not Implemented
UK2001 # 10 Y:2020 10 2020 REPLACE BOILER $10,114 $45,600 Not Implemented
UK2001 # 11 Y:2020 11 2020 OPTIMIZE PLANT POWER FACTOR $31,564 $19,285 Not Implemented
UK1916 # 01 Y:2019 01 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,170 $0 n/a
UK1916 # 02 Y:2019 02 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,894 $0 n/a
UK1916 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,394 $25,674 n/a
UK1916 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $195 $75 n/a
UK1916 # 05 Y:2019 05 2019 AIR CONDITION ONLY SPACE NECESSARY $4,922 $11,550 n/a
UK1916 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,402 $2,614 n/a
UK1916 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,602 $2,270 n/a
UK1916 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,946 $0 n/a
UK1916 # 09 Y:2019 09 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $86,132 $206,000 n/a
UK1916 # 10 Y:2019 10 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,706 $225,000 n/a
UK1915 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,711 $2,510 n/a
UK1915 # 02 Y:2019 02 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $7,951 $17,032 n/a
UK1915 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $259 $260 n/a