Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK2002 # 05 Y:2020 | 05 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $17,165 | $0 | Implemented |
UK2001 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,076 | $2,010 | Implemented |
UK2001 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,413 | $0 | Not Implemented |
UK2001 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,887 | $9,378 | Implemented |
UK2001 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $571 | $875 | Implemented |
UK2001 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,684 | $2,240 | Not Implemented |
UK2001 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $118,102 | $6,775 | Not Implemented |
UK2001 # 07 Y:2020 | 07 | 2020 | CLEAN CONDENSER TUBES | $4,023 | $8,700 | Implemented |
UK2001 # 08 Y:2020 | 08 | 2020 | INSULATE BARE EQUIPMENT | $2,547 | $1,006 | Not Implemented |
UK2001 # 09 Y:2020 | 09 | 2020 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $252,728 | $102,800 | Not Implemented |
UK2001 # 10 Y:2020 | 10 | 2020 | REPLACE BOILER | $10,114 | $45,600 | Not Implemented |
UK2001 # 11 Y:2020 | 11 | 2020 | OPTIMIZE PLANT POWER FACTOR | $31,564 | $19,285 | Not Implemented |
UK1916 # 01 Y:2019 | 01 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,170 | $0 | n/a |
UK1916 # 02 Y:2019 | 02 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $18,894 | $0 | n/a |
UK1916 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,394 | $25,674 | n/a |
UK1916 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $195 | $75 | n/a |
UK1916 # 05 Y:2019 | 05 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $4,922 | $11,550 | n/a |
UK1916 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,402 | $2,614 | n/a |
UK1916 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,602 | $2,270 | n/a |
UK1916 # 08 Y:2019 | 08 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,946 | $0 | n/a |
UK1916 # 09 Y:2019 | 09 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $86,132 | $206,000 | n/a |
UK1916 # 10 Y:2019 | 10 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $139,706 | $225,000 | n/a |
UK1915 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,711 | $2,510 | n/a |
UK1915 # 02 Y:2019 | 02 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $7,951 | $17,032 | n/a |
UK1915 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $259 | $260 | n/a |