IAC logo
IAC Assessment: UL2202
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL2202
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 2022
Principal Product Industrial metal products
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 172,000
Annual Production 19,200,000 Pounds
Production Hrs. Annual 4,550
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,983 3,789,600 kWh $0.03
Electricity Demand $205,866 10,678 kW-months/year $19.28
Electricity Fees $41,363 - $ -
Natural Gas $20,573 2,415 MMBtu $8.52
TOTAL ENERGY COSTS $387,785
RECOMMENDED SAVINGS* $109,804 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,637
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$23,158
Cost:
-
- - - - $23,158 - -
-
kWh
-
-
kW-months/year
$23,158
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,861
Cost:
$12,941
$2,650 82,827 $4,211 218 - - $2,650
82,827
kWh
$4,211
218
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,677
Cost:
-
$4,677 146,146 - - - - $4,677
146,146
kWh
-
-
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$649
Cost:
-
$649 20,279 - - - - $649
20,279
kWh
-
-
kW-months/year
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$16,897
Cost:
$12,250
- - - - $16,897 - -
-
kWh
-
-
kW-months/year
$16,897
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$50,126
Cost:
$1,220,427
$50,126 1,566,448 - - - - $50,126
1,566,448
kWh
-
-
kW-months/year
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$495
Cost:
$4,750
$495 15,454 - - - - $495
15,454
kWh
-
-
kW-months/year
-
-
$
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$6,941
Cost:
-
- - $6,941 360 - - -
-
kWh
$6,941
360
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$109,804
Cost:
$1,250,368
$58,597 1,831,154 $11,152 578 $40,055 - $58,597
1,831,154
kWh
$11,152
578
kW-months/year
$40,055
-
$
TOTAL IMPLEMENTED Savings:
$41,637
Cost:
$12,941
$7,327 228,973 $11,152 578 $23,158 - $7,327
228,973
kWh
$11,152
578
kW-months/year
$23,158
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees