Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1011 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,528 | $8,106 | Not Implemented |
OK1011 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,937 | $15,573 | Implemented |
OK1011 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,176 | $71,250 | Implemented |
OK1011 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $13,080 | $57,161 | Not Implemented |
OK1011 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $5,110 | $63 | Not Implemented |
OK1011 # 07 Y:2019 | 07 | 2019 | INSTALL SET-BACK TIMERS | $480 | $240 | Not Implemented |
OK1011 # 08 Y:2019 | 08 | 2019 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $18,744 | $35,736 | Not Implemented |
OK1011 # 09 Y:2019 | 09 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $1,628 | $0 | Implemented |
OK1010 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $4,905 | $12,400 | Implemented |
OK1010 # 02 Y:2019 | 02 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $7,438 | $1,936 | Implemented |
OK1010 # 03 Y:2019 | 03 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,032 | $947 | Implemented |
OK1010 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $885 | $1,760 | Implemented |
OK1010 # 05 Y:2019 | 05 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,024 | $3,948 | Not Implemented |
OK1010 # 06 Y:2019 | 06 | 2019 | USE OPTIMUM THICKNESS INSULATION | $11,922 | $53,750 | Not Implemented |
OK1010 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,016 | $11,730 | Not Implemented |
OK1009 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,453 | $37,361 | Not Implemented |
OK1009 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,469 | $833 | Implemented |
OK1009 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,224 | $0 | Not Implemented |
OK1009 # 04 Y:2019 | 04 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $7,915 | $0 | Implemented |
OK1009 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $365 | $1,365 | Not Implemented |
OK1009 # 06 Y:2019 | 06 | 2019 | PAY UTILITY BILLS ON TIME | $371 | $0 | Not Implemented |
OK1009 # 07 Y:2019 | 07 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $8,182 | $1,430 | Implemented |
OK1007 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,929 | $3,017 | Not Implemented |
OK1007 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $390 | $1,047 | Not Implemented |
OK1007 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,238 | $0 | Not Implemented |