IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1011 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,528 $8,106 Not Implemented
OK1011 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,937 $15,573 Implemented
OK1011 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,176 $71,250 Implemented
OK1011 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $13,080 $57,161 Not Implemented
OK1011 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $5,110 $63 Not Implemented
OK1011 # 07 Y:2019 07 2019 INSTALL SET-BACK TIMERS $480 $240 Not Implemented
OK1011 # 08 Y:2019 08 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $18,744 $35,736 Not Implemented
OK1011 # 09 Y:2019 09 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $1,628 $0 Implemented
OK1010 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $4,905 $12,400 Implemented
OK1010 # 02 Y:2019 02 2019 INSTALL TIMERS AND/OR THERMOSTATS $7,438 $1,936 Implemented
OK1010 # 03 Y:2019 03 2019 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,032 $947 Implemented
OK1010 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $1,760 Implemented
OK1010 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,024 $3,948 Not Implemented
OK1010 # 06 Y:2019 06 2019 USE OPTIMUM THICKNESS INSULATION $11,922 $53,750 Not Implemented
OK1010 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,016 $11,730 Not Implemented
OK1009 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,453 $37,361 Not Implemented
OK1009 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,469 $833 Implemented
OK1009 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,224 $0 Not Implemented
OK1009 # 04 Y:2019 04 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $7,915 $0 Implemented
OK1009 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $365 $1,365 Not Implemented
OK1009 # 06 Y:2019 06 2019 PAY UTILITY BILLS ON TIME $371 $0 Not Implemented
OK1009 # 07 Y:2019 07 2019 INSTALL TIMERS AND/OR THERMOSTATS $8,182 $1,430 Implemented
OK1007 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,929 $3,017 Not Implemented
OK1007 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $390 $1,047 Not Implemented
OK1007 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,238 $0 Not Implemented