IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,152

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0064 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $15,210 $7,760 Not Implemented
KU0064 # 04 Y:1982 04 1982 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,128 $7,500 Implemented
KU0064 # 05 Y:1982 05 1982 INSTALL TIMERS AND/OR THERMOSTATS $6,755 $6,659 Not Implemented
KU0064 # 06 Y:1982 06 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $8,191 $19,400 Not Implemented
KU0064 # 07 Y:1982 07 1982 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,136 $8,125 Not Implemented
KU0064 # 08 Y:1982 08 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,469 $643 Implemented
KU0064 # 09 Y:1982 09 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,891 $150 Not Implemented
KU0064 # 10 Y:1982 10 1982 INSTALL AUTOMATIC STACK DAMPER $2,357 $1,365 Not Implemented
KU0064 # 11 Y:1982 11 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,002 $882 Not Implemented
KU0064 # 12 Y:1982 12 1982 REPLACE BOILER $1,205 $3,200 Not Implemented
KU0065 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,491 $47,000 Not Implemented
KU0065 # 02 Y:1982 02 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $12,228 $1,619 Not Implemented
KU0065 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,815 $0 Implemented
KU0065 # 04 Y:1982 04 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $441 $0 Not Implemented
KU0065 # 05 Y:1982 05 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $459 $1,000 Not Implemented
KU0065 # 06 Y:1982 06 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $290 $0 Not Implemented
KU0065 # 07 Y:1982 07 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $214 $59 Not Implemented
KU0065 # 08 Y:1982 08 1982 INSTALL AUTOMATIC STACK DAMPER $326 $528 Not Implemented
GT0127 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,156 $180 Implemented
GT0127 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $2,466 $1,500 Implemented
GT0127 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,384 $345 Not Implemented
GT0127 # 04 Y:1982 04 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $294 $414 Implemented
GT0129 # 01 Y:1982 01 1982 RECOVER WASTE HEAT FROM EQUIPMENT $23,148 $15,500 Not Implemented
GT0129 # 02 Y:1982 02 1982 COVER OPEN TANKS $55,090 $5,750 Not Implemented
GT0129 # 03 Y:1982 03 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,398 $0 Not Implemented