IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0026 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $222 $300 Implemented
MO0026 # 08 Y:1991 08 1991 IMPROVE LUBRICATION PRACTICES $160 $112 Implemented
MO0027 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $673 $2,931 Implemented
MO0027 # 02 Y:1991 02 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,705 $0 Implemented
MO0027 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,369 $288 Implemented
MO0027 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $318 $549 Implemented
MO0027 # 05 Y:1991 05 1991 USE MULTIPLE-EFFECT EVAPORATORS $978 $0 Implemented
MO0027 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $701 Implemented
MO0027 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,440 $300 Implemented
MO0028 # 01 Y:1991 01 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,773 $802 Implemented
MO0028 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,834 $1,339 Implemented
MO0028 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,422 $1,295 Implemented
MO0028 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,957 $10,464 Implemented
MO0028 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,955 $0 Implemented
MO0028 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,265 $90 Implemented
KU0341 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $2,057 $600 Not Implemented
KU0341 # 02 Y:1991 02 1991 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $3,592 $400 Not Implemented
KU0341 # 03 Y:1991 03 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,117 $950 Not Implemented
KU0341 # 04 Y:1991 04 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,453 $9,300 Not Implemented
KU0341 # 05 Y:1991 05 1991 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,435 $800 Not Implemented
KU0341 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,048 $570 Not Implemented
KU0341 # 07 Y:1991 07 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,561 $1,975 Not Implemented
KU0341 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,102 $800 Not Implemented
MO0023 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,155 $7,104 Implemented
MO0023 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,664 $695 Implemented