IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0112 # 12 Y:1994 12 1994 USE SYNTHETIC LUBRICANT $4,287 $4,235 Not Implemented
AS0112 # 13 Y:1994 13 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,104 $16,099 Implemented
AS0112 # 14 Y:1994 14 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,107 $0 Implemented
AS0112 # 15 Y:1994 15 1994 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $119,133 $463,200 Not Implemented
OR0199 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $2,311 $3,000 Implemented
OR0199 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $256 $1,029 Implemented
OR0199 # 03 Y:1994 03 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,465 $0 Implemented
OR0199 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $1,820 Implemented
OR0199 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $385 $500 Implemented
OR0199 # 06 Y:1994 06 1994 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $953 $39,794 Implemented
NC0018 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,012 $480 Implemented
NC0018 # 02 Y:1994 02 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $742 $350 Not Implemented
NC0018 # 03 Y:1994 03 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,252 $11,500 Implemented
NC0018 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $6,600 Implemented
NC0018 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $1,046 Not Implemented
WI0202 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,110 $500 Implemented
WI0202 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,157 $4,594 Not Implemented
WI0202 # 03 Y:1994 03 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,862 $2,500 Not Implemented
WI0202 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,092 $1,764 Implemented
WI0202 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $280 $150 Not Implemented
WI0202 # 06 Y:1994 06 1994 USE PHOTOCELL CONTROLS $179 $75 Not Implemented
WI0202 # 07 Y:1994 07 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $833 $0 Not Implemented
WI0202 # 08 Y:1994 08 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $609 $400 Implemented
WI0202 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $451 $0 Implemented
WI0202 # 10 Y:1994 10 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $321 $1,280 Not Implemented