IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0001 # 05 Y:1994 05 1994 INSTALL STORM WINDOWS AND DOORS $740 $20 Not Implemented
DS0001 # 06 Y:1994 06 1994 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,760 $44,950 Not Implemented
DS0001 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $130 $690 Not Implemented
DS0001 # 08 Y:1994 08 1994 USE RADIANT HEATER FOR SPOT HEATING $9,150 $34,800 Not Implemented
NC0018 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,012 $480 Implemented
NC0018 # 02 Y:1994 02 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $742 $350 Not Implemented
NC0018 # 03 Y:1994 03 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,252 $11,500 Implemented
NC0018 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,437 $6,600 Implemented
NC0018 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,509 $1,046 Not Implemented
OR0199 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $2,311 $3,000 Implemented
OR0199 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $256 $1,029 Implemented
OR0199 # 03 Y:1994 03 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,465 $0 Implemented
OR0199 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $1,820 Implemented
OR0199 # 05 Y:1994 05 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $385 $500 Implemented
OR0199 # 06 Y:1994 06 1994 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $953 $39,794 Implemented
MA0296 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $48,128 $7,677 Not Implemented
MA0296 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,136 $10,870 Not Implemented
MA0296 # 03 Y:1994 03 1994 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,909 $20,205 Not Implemented
MA0296 # 04 Y:1994 04 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,525 $7,280 Not Implemented
MA0296 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,714 $0 Implemented
MA0296 # 06 Y:1994 06 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,786 $1,786 Not Implemented
MA0296 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $881 $121 Not Implemented
MA0296 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $514 $644 Implemented
MA0296 # 09 Y:1994 09 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $303 $688 Not Implemented
WI0202 # 08 Y:1994 08 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $609 $400 Implemented