IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0019 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,883 $564 Not Implemented
MO0019 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,233 $340 Not Implemented
MO0019 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $877 $20 Not Implemented
MO0019 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $455 $995 Not Implemented
KU0334 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,153 $1,800 Implemented
KU0334 # 02 Y:1991 02 1991 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $336 $40 Implemented
KU0334 # 03 Y:1991 03 1991 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $22,062 $33,150 Implemented
KU0334 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,034 $4,200 Implemented
KU0334 # 05 Y:1991 05 1991 RECOVER WASTE HEAT FROM EQUIPMENT $6,382 $0 Implemented
KU0334 # 06 Y:1991 06 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,054 $16,950 Implemented
KU0334 # 07 Y:1991 07 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,665 $22,600 Implemented
KU0334 # 08 Y:1991 08 1991 INSTALL SET-BACK TIMERS $454 $120 Implemented
KU0333 # 03 Y:1991 03 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,970 $20,000 Implemented
KU0333 # 04 Y:1991 04 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,825 $4,000 Implemented
KU0333 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $153 $0 Implemented
KU0333 # 06 Y:1991 06 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,398 $200 Implemented
KU0333 # 07 Y:1991 07 1991 INSTALL SET-BACK TIMERS $698 $1,000 Implemented
KU0333 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85 $84 Implemented
KU0333 # 01 Y:1991 01 1991 REDESIGN PROCESS $1,119 $0 Implemented
KU0333 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,551 $3,600 Implemented
MO0017 # 01 Y:1991 01 1991 RECOVER AND REUSE COOLING WATER $31,939 $0 Not Implemented
MO0017 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,734 $5,100 Not Implemented
MO0017 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $1,087 Not Implemented
MO0017 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,750 $570 Not Implemented
MO0017 # 05 Y:1991 05 1991 MINIMIZE WATER USAGE $1,269 $0 Not Implemented