Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50,280
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA3019 # 08 Y:2012 | 08 | 2012 | INSULATE BARE EQUIPMENT | $2,412 | $1,248 | Implemented |
UA3019 # 09 Y:2012 | 09 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $99,802 | $195,000 | Not Implemented |
UA3019 # 10 Y:2012 | 10 | 2012 | IMPROVE COMBUSTION CONTROL CAPABILITY | $28,009 | $90,000 | Not Implemented |
UA3019 # 11 Y:2012 | 11 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $4,250 | $4,060 | Not Implemented |
UA3019 # 12 Y:2012 | 12 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,737 | $800 | Not Implemented |
IA0482 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,985 | $8,240 | Not Implemented |
IA0482 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,402 | $1,618 | Not Implemented |
IA0482 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $1,963 | $1,193 | Not Implemented |
IA0482 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,615 | $753 | Not Implemented |
IA0482 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,152 | $249 | Not Implemented |
IA0482 # 06 Y:2012 | 06 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $772 | $285 | Not Implemented |
DL0089 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,050 | $6,800 | Implemented |
DL0089 # 02 Y:2012 | 02 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $7,675 | $27,000 | Implemented |
DL0089 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,880 | $0 | Implemented |
DL0089 # 04 Y:2012 | 04 | 2012 | REDUCE VENTILATION AIR | $620 | $81 | Implemented |
DL0089 # 05 Y:2012 | 05 | 2012 | USE OPTIMUM THICKNESS INSULATION | $1,025 | $2,275 | Not Implemented |
LE0340 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,181 | $8,250 | Not Implemented |
LE0340 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,208 | $54,225 | Not Implemented |
LE0340 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $953 | $1,000 | Not Implemented |
LE0340 # 04 Y:2012 | 04 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $26,676 | $0 | Not Implemented |
LE0340 # 05 Y:2012 | 05 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,033 | $5,527 | Not Implemented |
LE0340 # 06 Y:2012 | 06 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,053 | $13,598 | Not Implemented |
LE0340 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,391 | $1,900 | Not Implemented |
LE0340 # 08 Y:2012 | 08 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $16,632 | $3,000 | Not Implemented |
LE0340 # 09 Y:2012 | 09 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,535 | $21,000 | Not Implemented |