IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0135 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,739 $40 Implemented
SD0135 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,084 $20,412 Implemented
SD0135 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $17,409 $20,135 Implemented
SD0135 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $2,105 $2,127 Implemented
SD0135 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $100 $0 Implemented
SD0135 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $100 $150 Implemented
SD0136 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,889 $3,260 Implemented
SD0136 # 02 Y:1996 02 1996 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,074 $2,083 Implemented
SD0136 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,321 $40 Implemented
SD0136 # 04 Y:1996 04 1996 USE OPTIMUM THICKNESS INSULATION $1,905 $651 Implemented
SD0136 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,979 $5,928 Implemented
SD0136 # 06 Y:1996 06 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $6,002 $4,080 Implemented
SD0136 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $1,471 $1,001 Implemented
SD0136 # 08 Y:1996 08 1996 REDUCE SCRAP PRODUCTION $56,160 $0 Implemented
WV0088 # 04 Y:1996 04 1996 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $22,916 $56,250 Not Implemented
WV0088 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $208 $680 Implemented
WV0088 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $610 $747 Not Implemented
WV0088 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $2,734 $252 Implemented
WV0088 # 08 Y:1996 08 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $240 $1,000 Not Implemented
OK0491 # 01 Y:1996 01 1996 BURN WASTE OIL FOR HEAT $1,349 $2,995 Not Implemented
OK0491 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,329 $30 Implemented
OK0491 # 03 Y:1996 03 1996 USE OPTIMUM THICKNESS INSULATION $12,771 $37,950 Implemented
OK0491 # 04 Y:1996 04 1996 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $9,832 $27,000 Not Implemented
OK0491 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $655 Implemented
OK0491 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $234 $400 Implemented