IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0012 # 04 Y:1990 04 1990 INSULATE BARE EQUIPMENT $115 $176 Implemented
MO0013 # 01 Y:1990 01 1990 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $1,504 $2,900 Implemented
MO0013 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $250 Implemented
MO0013 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $306 $200 Implemented
MO0013 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $460 $50 Not Implemented
MO0013 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $226 $199 Implemented
KU0317 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $206 Implemented
KU0317 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $240 Implemented
KU0317 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,311 $1,400 Implemented
KU0317 # 04 Y:1990 04 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $453 $0 Not Implemented
KU0317 # 05 Y:1990 05 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $571 $950 Not Implemented
MO0003 # 01 Y:1990 01 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,407 $14,600 Implemented
MO0003 # 02 Y:1990 02 1990 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,851 $10,420 Implemented
MO0003 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,696 $2,100 Not Implemented
MO0003 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,542 $456 Not Implemented
MO0003 # 05 Y:1990 05 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,989 $1,400 Not Implemented
MO0003 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,518 $100 Not Implemented
MO0003 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $248 $0 Not Implemented
MO0004 # 01 Y:1990 01 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,823 $5,275 Not Implemented
MO0004 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $750 $830 Implemented
MO0004 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $3,990 $1,676 Implemented
MO0004 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,866 $100 Implemented
MO0004 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,387 $244 Implemented
MO0004 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $949 $86 Implemented
MO0005 # 01 Y:1990 01 1990 INSULATE BARE EQUIPMENT $2,439 $3,511 Implemented