IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2314 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $2,702 $800 n/a
UC2314 # 06 Y:2023 06 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $627 $1,061 n/a
UC2314 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,655 $1,283 n/a
UC2314 # 02 Y:2023 02 2023 PAY UTILITY BILLS ON TIME $3,211 $0 n/a
UC2314 # 07 Y:2023 07 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,082 $1,674 n/a
UC2314 # 13 Y:2023 13 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $24,735 $170,000 n/a
UC2314 # 04 Y:2023 04 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,943 $21,500 n/a
UC2314 # 11 Y:2023 11 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $197,753 $1,537,591 n/a
UC2314 # 12 Y:2023 12 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $26,966 $395,108 n/a
UC2314 # 09 Y:2023 09 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $14,221 $0 n/a
UC2314 # 10 Y:2023 10 2023 REPLACE BOILER $8,265 $39,281 n/a
UC2314 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,033 $0 n/a
UC2314 # 15 Y:2023 15 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,312 $39,269 n/a
UC2314 # 14 Y:2023 14 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,261 $34,348 n/a
UC2314 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,543 $0 n/a
MA0863 # 04 Y:2023 04 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,662 $500 n/a
MA0863 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $61,906 $581,126 n/a
MA0863 # 03 Y:2023 03 2023 USE HEAT PUMP FOR SPACE CONDITIONING $11,988 $30,000 n/a
MA0863 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $7,472 $38,800 n/a
MA0863 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,184 $71,775 n/a
MA0863 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $697 $125 n/a
MA0862 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $24,241 $55,000 n/a
MA0862 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $4,461 $14,400 n/a
MA0862 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,262 $30,900 n/a
MA0862 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,059 $800 n/a