Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,684
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0439 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,650 | $0 | n/a |
MS0439 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $586 | $8,100 | n/a |
MS0438 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,668 | $282,366 | n/a |
MS0438 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $419 | $956 | n/a |
TT0325 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,049 | $30,040 | n/a |
TT0325 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,955 | $1,000 | n/a |
TT0325 # 10 Y:2025 | 10 | 2025 | METER WASTE WATER | $1,047 | $1,100 | n/a |
TT0325 # 06 Y:2025 | 06 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,854 | $400 | n/a |
TT0325 # 02 Y:2025 | 02 | 2025 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $68,822 | $200,000 | n/a |
TT0325 # 01 Y:2025 | 01 | 2025 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $242,348 | $1,045,217 | n/a |
TT0325 # 03 Y:2025 | 03 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $30,978 | $17,480 | n/a |
TT0325 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,824 | $22,500 | n/a |
TT0325 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,974 | $16,000 | n/a |
TT0325 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $4,068 | $15,000 | n/a |
TT0325 # 11 Y:2025 | 11 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $718 | $2,640 | n/a |
MS0443 # 02 Y:2024 | 02 | 2024 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $51,282 | $1,786,854 | n/a |
MS0443 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,318 | $433,405 | n/a |
MS0443 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,762 | $50,000 | n/a |
MS0437 # 04 Y:2024 | 04 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $288,884 | $300,000 | n/a |
MS0437 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $34,017 | $458,990 | n/a |
MS0437 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $272 | $2,237 | n/a |
MS0437 # 01 Y:2024 | 01 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $147 | $0 | n/a |
MS0436 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $4,420 | $255 | n/a |
MS0436 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,430 | $50,000 | n/a |
MS0436 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $822 | $15,226 | n/a |