IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0623 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,088 $3,402 n/a
WV0672 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $3,058 $6,936 n/a
UF0623 # 03 Y:2024 03 2024 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $4,089 $5,440 n/a
WV0672 # 03 Y:2024 03 2024 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $20,948 $26,406 n/a
UU0260 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $27,825 $247,680 n/a
WV0672 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $401 $38 n/a
UU0260 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $489 $1,818 n/a
WV0672 # 01 Y:2024 01 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $73,416 $271,368 n/a
UF0623 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $958 $1,400 n/a
WV0672 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,640 $5,016 n/a
UF0623 # 08 Y:2024 08 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $56,000 $20,720 n/a
UF0623 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,616 $0 n/a
UD1096 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,551 $5,809 n/a
UD1096 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $407 $0 n/a
UU0260 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $726 $3,000 n/a
UF0623 # 02 Y:2024 02 2024 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,057 $4,000 n/a
UU0260 # 02 Y:2024 02 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,585 $5,800 n/a
UU0260 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,557 $6,277 n/a
WV0672 # 02 Y:2024 02 2024 USE EVAPORATION TO CONCENTRATE MATERIAL $24,278 $31,216 n/a
WV0672 # 04 Y:2024 04 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,264 $9,760 n/a
UD1096 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,767 $6,096 n/a
WV0672 # 11 Y:2024 11 2024 OPTIMIZE PLANT POWER FACTOR $596 $2,964 n/a
UD1096 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,966 $0 n/a
UD1096 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $24,210 $242,106 n/a
WV0672 # 10 Y:2024 10 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $797 $1,579 n/a