IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0010 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $9,629 $1,369 Implemented
SJ0010 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16 $39 Not Implemented
SJ0010 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $449 $178 Not Implemented
SJ0010 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $786 Implemented
SJ0010 # 08 Y:2024 08 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $274 $0 Implemented
SF0611 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $14,817 $0 Implemented
SF0611 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,908 $0 Implemented
SF0611 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $61,975 $1,800 Implemented
SF0611 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,353 $2,100 Not Implemented
SF0611 # 05 Y:2024 05 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,909 $18,675 Not Implemented
SF0611 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $165,339 $1,651,070 Implemented
SD0645 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,027 $20,044 Not Implemented
SD0645 # 02 Y:2024 02 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,908 $5,515 Not Implemented
SD0645 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,560 $10,840 Not Implemented
SD0645 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $55,997 $84,760 Not Implemented
SD0645 # 05 Y:2024 05 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $48,532 $0 Not Implemented
SD0645 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,170 $3,900 Not Implemented
SD0645 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $1,694 Not Implemented
SD0645 # 08 Y:2024 08 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $49,587 $0 Not Implemented
SD0644 # 01 Y:2024 01 2024 USE PHOTOCELL CONTROLS $693 $1,890 Not Implemented
SD0644 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $1,016 Not Implemented
SD0644 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $240 Not Implemented
SD0644 # 04 Y:2024 04 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $3,868 $8,200 Not Implemented
SD0644 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $5,961 $1,050 Not Implemented
SD0644 # 06 Y:2024 06 2024 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $61,738 $0 Not Implemented