Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0857 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $142,150 | $130,500 | Not Implemented |
GT0857 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,834 | $29,404 | Not Implemented |
GT0857 # 04 Y:2008 | 04 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,781 | $20,000 | Not Implemented |
GT0857 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,655 | $119,957 | Not Implemented |
GT0857 # 06 Y:2008 | 06 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,243 | $1,636 | Not Implemented |
GT0857 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,400 | $30,135 | Not Implemented |
DL0027 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,800 | $0 | Implemented |
DL0027 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,691 | $27,814 | Not Implemented |
DL0027 # 03 Y:2008 | 03 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,514 | $52,000 | Implemented |
LE0277 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,555 | $1,000 | Not Implemented |
LE0277 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,354 | $15,000 | Not Implemented |
LE0277 # 03 Y:2008 | 03 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,444 | $500 | Not Implemented |
LE0277 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,656 | $130 | Not Implemented |
LE0277 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,432 | $200 | Not Implemented |
LE0277 # 06 Y:2008 | 06 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,194 | $2,500 | Not Implemented |
LE0277 # 07 Y:2008 | 07 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $884 | $800 | Not Implemented |
LE0277 # 08 Y:2008 | 08 | 2008 | USE SOLAR HEAT TO HEAT WATER | $354 | $1,260 | Not Implemented |
LE0277 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,555 | $3,555 | Not Implemented |
LE0277 # 10 Y:2008 | 10 | 2008 | INSTALL OCCUPANCY SENSORS | $755 | $60 | Not Implemented |
UF0416 # 01 Y:2008 | 01 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $950 | $4,000 | Implemented |
UF0416 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $70,300 | $53,500 | Implemented |
UF0416 # 03 Y:2008 | 03 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $53,629 | $49,236 | Not Implemented |
UF0416 # 04 Y:2008 | 04 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,217 | $0 | Implemented |
UF0416 # 05 Y:2008 | 05 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $5,057 | $0 | Not Implemented |
UF0416 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,189 | $227,490 | Not Implemented |