Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0434 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,479 | $4,000 | Not Implemented |
UM0434 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,445 | $8,750 | Not Implemented |
UM0434 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $2,500 | Implemented |
UM0434 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,027 | $200 | Not Implemented |
DL0115 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,106 | $0 | Implemented |
DL0115 # 02 Y:2013 | 02 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,900 | $350 | Implemented |
DL0115 # 03 Y:2013 | 03 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,400 | $16,000 | Not Implemented |
DL0115 # 04 Y:2013 | 04 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,460 | $29,700 | Implemented |
DL0115 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,140 | $3,380 | Not Implemented |
DL0115 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $640 | $600 | Implemented |
DL0115 # 07 Y:2013 | 07 | 2013 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $830 | $6,000 | Not Implemented |
DL0115 # 08 Y:2013 | 08 | 2013 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,405 | $2,110 | Not Implemented |
DL0115 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,710 | $8,485 | Implemented |
DL0115 # 10 Y:2013 | 10 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,270 | $0 | Implemented |
MA0717 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,124 | $14,700 | Not Implemented |
MA0717 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,293 | $8,275 | Implemented |
MA0717 # 03 Y:2013 | 03 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,036 | $8,700 | Not Implemented |
MA0717 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,986 | $5,700 | Implemented |
MA0717 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,679 | $4,082 | Implemented |
MZ0134 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $53,250 | $61,965 | Implemented |
MZ0134 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $22,321 | $12,640 | Not Implemented |
MZ0134 # 03 Y:2013 | 03 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,044 | $2,500 | Implemented |
MZ0134 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,322 | $1,333 | Not Implemented |
MZ0134 # 05 Y:2013 | 05 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,688 | $16,575 | Not Implemented |
MZ0134 # 06 Y:2013 | 06 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,932 | $2,000 | Not Implemented |