IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0308 # 02 Y:1990 02 1990 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $7,309 $2,500 Implemented
KU0308 # 03 Y:1990 03 1990 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $2,009 $250 Implemented
KU0308 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $665 $80 Implemented
KU0308 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,013 $1,600 Implemented
KU0308 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $633 $0 Not Implemented
KU0308 # 07 Y:1990 07 1990 INSTALL AUTOMATIC STACK DAMPER $2,280 $3,000 Implemented
KU0308 # 08 Y:1990 08 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $106 $0 Implemented
KU0308 # 09 Y:1990 09 1990 INSULATE BARE EQUIPMENT $246 $165 Implemented
KU0308 # 10 Y:1990 10 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,139 $1,600 Implemented
KU0309 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,546 $12,840 Implemented
KU0309 # 02 Y:1990 02 1990 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $10,130 $10,000 Not Implemented
KU0309 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,042 $4,000 Implemented
KU0309 # 04 Y:1990 04 1990 TREAT AND REUSE RINSE WATERS $5,895 $4,000 Implemented
KU0309 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $386 $300 Implemented
KU0309 # 06 Y:1990 06 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $126 $180 Implemented
KU0309 # 07 Y:1990 07 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $22,428 $20,000 Not Implemented
KU0309 # 08 Y:1990 08 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,990 $2,400 Implemented
KU0310 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,155 $4,288 Implemented
KU0310 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,513 $280 Implemented
KU0310 # 03 Y:1990 03 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,188 $18,000 Not Implemented
KU0310 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $734 $0 Not Implemented
KU0310 # 05 Y:1990 05 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,069 $1,000 Implemented
KU0310 # 06 Y:1990 06 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $496 $0 Implemented
KU0310 # 07 Y:1990 07 1990 COMBINE UTILITY METERS $230 $150 Not Implemented
KU0307 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,882 $1,861 Implemented