Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,521
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0212 # 03 Y:1984 | 03 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $334 | $192 | Implemented |
GT0212 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,069 | $145 | Implemented |
GT0212 # 05 Y:1984 | 05 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $739 | $861 | Implemented |
GT0216 # 01 Y:1984 | 01 | 1984 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,648 | $500 | Implemented |
GT0216 # 02 Y:1984 | 02 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,006 | $967 | Implemented |
GT0216 # 03 Y:1984 | 03 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,352 | $5,000 | Not Implemented |
GT0216 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,561 | $127 | Not Implemented |
GT0216 # 05 Y:1984 | 05 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $840 | $150 | Implemented |
GT0206 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,815 | $200 | Implemented |
GT0206 # 02 Y:1984 | 02 | 1984 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,580 | $4,500 | Implemented |
GT0206 # 03 Y:1984 | 03 | 1984 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $14,224 | $9,000 | Implemented |
GT0206 # 04 Y:1984 | 04 | 1984 | INSULATE BARE EQUIPMENT | $5,168 | $6,540 | Not Implemented |
GT0208 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,150 | $1,550 | Implemented |
GT0208 # 02 Y:1984 | 02 | 1984 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,482 | $6,948 | Implemented |
GT0208 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,580 | $5,660 | Implemented |
GT0208 # 04 Y:1984 | 04 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,720 | $0 | Implemented |
GT0208 # 05 Y:1984 | 05 | 1984 | REDESIGN PROCESS | $10,210 | $20,000 | Implemented |
GT0208 # 06 Y:1984 | 06 | 1984 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $18,300 | $20,000 | Implemented |
GT0209 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,600 | $500 | Implemented |
GT0209 # 02 Y:1984 | 02 | 1984 | MODIFY DYE BECK | $77,000 | $100,000 | Not Implemented |
GT0209 # 03 Y:1984 | 03 | 1984 | MODIFY DYE BECK | $23,700 | $0 | Not Implemented |
GT0209 # 04 Y:1984 | 04 | 1984 | MODIFY DYE BECK | $7,435 | $60,000 | Not Implemented |
GT0209 # 05 Y:1984 | 05 | 1984 | MODIFY DYE BECK | $7,227 | $15,000 | Not Implemented |
GT0209 # 06 Y:1984 | 06 | 1984 | MODIFY TEXTILE DRYERS | $24,720 | $20,000 | Not Implemented |
GT0209 # 07 Y:1984 | 07 | 1984 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,360 | $10,000 | Not Implemented |