IAC Assessment: GT0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1984
Principal Product CARPET YARN
NAICS n/a
SIC 2284 - Thread Mills
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 0
Annual Production 25,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,286,223 29,184,057 kWh $0.04
Natural Gas $313,398 74,318 MMBtu $4.22
Fuel Oil #6 $27,331 5,212 MMBtu $5.24
TOTAL ENERGY COSTS $1,626,952
RECOMMENDED SAVINGS* $76,980 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,677
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6
$ kWh $ MMBtu $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,817
Cost:
$500
- - $6,270 1,487 $547 103 -
-
kWh
$6,270
1,487
MMBtu
$547
103
MMBtu
02: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$4,716
Cost:
$5,000
- - $4,339 1,029 $377 71 -
-
kWh
$4,339
1,029
MMBtu
$377
71
MMBtu
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$18,719
Cost:
$15,000
- - $17,205 4,080 $1,514 285 -
-
kWh
$17,205
4,080
MMBtu
$1,514
285
MMBtu
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$2,089
Cost:
$2,000
- - $1,919 455 $170 32 -
-
kWh
$1,919
455
MMBtu
$170
32
MMBtu
05: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$11,160
Cost:
$10,000
$11,160 489,449 - - - - $11,160
489,449
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$23,900
Cost:
$12,000
$23,900 - - - - - $23,900
-
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,879
Cost:
$7,166
$6,879 158,558 - - - - $6,879
158,558
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,700
Cost:
$3,780
$2,700 61,547 - - - - $2,700
61,547
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$76,980
Cost:
$55,446
$44,639 709,554 $29,733 7,051 $2,608 491 $44,639
709,554
kWh
$29,733
7,051
MMBtu
$2,608
491
MMBtu
TOTAL IMPLEMENTED Savings:
$20,677
Cost:
$14,280
$13,860 550,996 $6,270 1,487 $547 103 $13,860
550,996
kWh
$6,270
1,487
MMBtu
$547
103
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #6 Electricity Usage Natural Gas Fuel Oil #6