IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0107 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,094 $20 Not Implemented
IA0107 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $525 $149 Implemented
NC0049 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,182 $1,290 Implemented
NC0049 # 02 Y:1995 02 1995 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $13,275 $180,000 Not Implemented
NC0049 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,443 $8,000 Not Implemented
NC0049 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,293 $432 Not Implemented
NC0049 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $1,245 $3,600 Not Implemented
NC0049 # 06 Y:1995 06 1995 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,915 $2,000 Implemented
NC0049 # 07 Y:1995 07 1995 ADD AREA LIGHTING SWITCHES $478 $1,200 Not Implemented
NC0049 # 08 Y:1995 08 1995 REDUCE GLAZED AREAS IN BUILDINGS $5,285 $1,400 Implemented
NC0049 # 09 Y:1995 09 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,233 $4,000 Not Implemented
NC0049 # 10 Y:1995 10 1995 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $10,722 $2,115 Not Implemented
UL0121 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,704 $1,718 Not Implemented
UL0121 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,040 $100 Not Implemented
UL0121 # 03 Y:1995 03 1995 OPTIMIZE PLANT POWER FACTOR $1,409 $3,185 Not Implemented
UL0120 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,450 $5,032 Implemented
UL0120 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,567 $2,780 Implemented
UL0120 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $93 Implemented
UL0120 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,583 $2,000 Implemented
UL0120 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $679 $1,497 Not Implemented
OD0025 # 01 Y:1995 01 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,115 $1,447 Implemented
OD0025 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $524 $500 Not Implemented
OD0025 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $418 $634 Implemented
OD0024 # 01 Y:1995 01 1995 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,967 $0 Implemented
OD0024 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $652 $1,625 Implemented