IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0294 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,153 $4,100 Implemented
KU0294 # 05 Y:1989 05 1989 INSULATE BARE EQUIPMENT $1,104 $600 Implemented
KU0294 # 06 Y:1989 06 1989 RECOVER WASTE HEAT FROM EQUIPMENT $526 $200 Implemented
KU0294 # 07 Y:1989 07 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $579 $0 Implemented
KU0286 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,513 $6,446 Implemented
KU0286 # 02 Y:1989 02 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $235 $0 Implemented
KU0286 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,139 $500 Implemented
KU0286 # 04 Y:1989 04 1989 INSTALL AUTOMATIC STACK DAMPER $6,820 $5,625 Implemented
KU0286 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,698 $1,800 Implemented
KU0286 # 06 Y:1989 06 1989 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,815 $20,000 Implemented
KU0286 # 07 Y:1989 07 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $204 $250 Implemented
KU0287 # 01 Y:1989 01 1989 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,331 $4,000 Not Implemented
KU0287 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,271 $400 Implemented
KU0287 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,214 $4,800 Not Implemented
KU0287 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,735 $2,700 Not Implemented
KU0287 # 05 Y:1989 05 1989 INSTALL TURBULATORS $3,748 $2,160 Not Implemented
KU0282 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,973 $270 Implemented
KU0282 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,991 $2,800 Not Implemented
KU0282 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,994 $3,600 Not Implemented
KU0282 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,121 $670 Implemented
KU0282 # 05 Y:1989 05 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,076 $522 Not Implemented
KU0282 # 06 Y:1989 06 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $319 $82 Implemented
KU0282 # 07 Y:1989 07 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $329 $50 Implemented
KU0282 # 08 Y:1989 08 1989 REDUCE OR ELIMINATE WASTE $800 $50 Implemented
KU0281 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,927 $4,000 Implemented