IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0017 # 02 Y:1994 02 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,343 $0 Implemented
NC0017 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,354 $10,150 Not Implemented
NC0017 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $9,405 $3,536 Not Implemented
NC0017 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,403 $1,230 Implemented
NC0017 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,366 $750 Implemented
NC0017 # 07 Y:1994 07 1994 USE RADIANT HEATER FOR SPOT HEATING $12,784 $14,500 Implemented
UF0082 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $907 $1,527 Not Implemented
UF0082 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $917 $2,370 Not Implemented
UF0082 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $308 $100 Not Implemented
UF0082 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,183 $2,250 Not Implemented
UF0082 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $1,957 $542 Implemented
AS0109 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,756 $825 Implemented
AS0109 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,292 $1,342 Implemented
AS0109 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $546 $500 Not Implemented
AS0109 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $585 Implemented
AS0109 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $7,611 $26,535 Not Implemented
AS0109 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $374 $2,060 Implemented
AS0108 # 01 Y:1994 01 1994 INSTALL OCCUPANCY SENSORS $1,756 $825 Not Implemented
AS0108 # 02 Y:1994 02 1994 USE SYNTHETIC LUBRICANT $2,004 $1,342 Not Implemented
AS0108 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $546 $500 Implemented
AS0108 # 04 Y:1994 04 1994 INSTALL TIMERS AND/OR THERMOSTATS $2,997 $585 Not Implemented
AS0108 # 05 Y:1994 05 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,611 $26,535 Not Implemented
AS0108 # 06 Y:1994 06 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $374 $2,060 Not Implemented
AM0202 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $36,010 $0 Not Implemented
AM0202 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $5,643 $21,675 Implemented