IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0281 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $960 $1,500 Implemented
KU0281 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $512 $214 Implemented
KU0281 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,778 $9,550 Implemented
KU0281 # 05 Y:1989 05 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,983 $500 Implemented
KU0281 # 06 Y:1989 06 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,023 $200 Not Implemented
KU0281 # 07 Y:1989 07 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $993 $0 Implemented
KU0276 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $1,432 Not Implemented
KU0276 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $658 $150 Implemented
KU0276 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $133 Implemented
KU0276 # 04 Y:1989 04 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,066 $22,000 Not Implemented
KU0276 # 05 Y:1989 05 1989 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $460 $400 Not Implemented
KU0277 # 01 Y:1989 01 1989 REDUCE VENTILATION AIR $7,959 $2,250 Not Implemented
KU0277 # 02 Y:1989 02 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,065 $2,775 Not Implemented
KU0277 # 03 Y:1989 03 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,439 $3,600 Not Implemented
KU0277 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,101 $2,112 Not Implemented
KU0277 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,474 $300 Not Implemented
KU0277 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $766 Not Implemented
KU0277 # 07 Y:1989 07 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $948 $0 Not Implemented
KU0277 # 08 Y:1989 08 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $504 $700 Not Implemented
KU0277 # 09 Y:1989 09 1989 IMPROVE LUBRICATION PRACTICES $457 $0 Not Implemented
KU0275 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $582 $1,068 Implemented
KU0275 # 02 Y:1989 02 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,256 $3,800 Not Implemented
KU0275 # 03 Y:1989 03 1989 REDUCE VENTILATION AIR $2,145 $400 Implemented
KU0275 # 04 Y:1989 04 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,836 $100 Not Implemented
KU0275 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,101 $270 Implemented