IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,855

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1065 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,692 $430 Not Implemented
UD1065 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $38,039 $0 Not Implemented
UD1065 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $19,345 $19,667 Not Implemented
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 Implemented
UD1065 # 06 Y:2023 06 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $210 $741 Not Implemented
UD1065 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,980 $2,457 Implemented
UD1065 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,334 $3,051 Not Implemented
AM0888 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $38,950 $3,000 Implemented
AM0888 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $7,550 $13,965 Implemented
AM0888 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,310 $5,795 Implemented
AM0888 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $5,750 $600 Not Implemented
AM0888 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,440 $0 Implemented
AM0888 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,190 $1,000 Implemented
AM0888 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,100 $4,040 Implemented
AM0888 # 08 Y:2023 08 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $895 $0 Implemented
AM0888 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $830 $734 Not Implemented
AM0888 # 10 Y:2023 10 2023 USE SYNTHETIC LUBRICANT $430 $230 Not Implemented
AM0888 # 11 Y:2023 11 2023 INSTALL OCCUPANCY SENSORS $235 $550 Implemented
IC0289 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,395 $19,066 Implemented
IC0289 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $9,069 $7,303 Implemented
IC0289 # 03 Y:2023 03 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,672 $0 Not Implemented
IC0289 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,347 $366,628 Not Implemented
IC0289 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $21,396 $151,345 Not Implemented
TT0300 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $46,047 $221,715 n/a
TT0300 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $41,095 $32,000 n/a