IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0097 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $112 $505 Implemented
HO0097 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $265 $600 Implemented
HO0097 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,495 $280 Implemented
HO0097 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $278 $290 Implemented
HO0097 # 07 Y:1995 07 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $15,668 $2,000 Not Implemented
WI0230 # 01 Y:1995 01 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,947 $0 Not Implemented
WI0230 # 02 Y:1995 02 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,633 $0 Implemented
WI0230 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $2,042 $2,089 Implemented
WI0230 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $442 $585 Implemented
WI0230 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,124 $500 Implemented
WI0230 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,111 $0 Not Implemented
WI0230 # 07 Y:1995 07 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,098 $0 Implemented
UF0111 # 01 Y:1995 01 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,947 $8,283 Not Implemented
UF0111 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,155 $1,524 Implemented
UF0111 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $336 $775 Implemented
UF0111 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $540 $166 Not Implemented
UF0111 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $9,291 $31,527 Not Implemented
SF0051 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,721 $1,802 Implemented
SF0051 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,730 $12,058 Implemented
SF0051 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $383 $220 Implemented
SF0051 # 04 Y:1995 04 1995 REPAIR AND ELIMINATE STEAM LEAKS $827 $100 Implemented
SF0051 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,798 $800 Implemented
SF0051 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $5,459 $9,350 Not Implemented
SF0051 # 07 Y:1995 07 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $377,412 $534,700 Not Implemented
WV0055 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,944 $1,558 Implemented