Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,521
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0176 # 06 Y:1983 | 06 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $113 | $250 | Not Implemented |
GT0178 # 01 Y:1983 | 01 | 1983 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $20,000 | $15,950 | Not Implemented |
GT0178 # 02 Y:1983 | 02 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,360 | $3,500 | Not Implemented |
GT0178 # 03 Y:1983 | 03 | 1983 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,100 | $2,300 | Not Implemented |
GT0178 # 04 Y:1983 | 04 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $735 | $250 | Not Implemented |
GT0179 # 01 Y:1983 | 01 | 1983 | CONTROL PRESSURE ON STEAMER OPERATIONS | $165,000 | $5,000 | Not Implemented |
GT0179 # 02 Y:1983 | 02 | 1983 | MODIFY TEXTILE DRYERS | $47,600 | $5,000 | Not Implemented |
GT0179 # 03 Y:1983 | 03 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,700 | $16,000 | Not Implemented |
GT0179 # 04 Y:1983 | 04 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,300 | $1,000 | Not Implemented |
GT0179 # 05 Y:1983 | 05 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,350 | $6,750 | Not Implemented |
GT0180 # 01 Y:1983 | 01 | 1983 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,000 | $62,500 | Implemented |
GT0180 # 02 Y:1983 | 02 | 1983 | REDUCE GLAZED AREAS IN BUILDINGS | $990 | $350 | Implemented |
GT0180 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,220 | $7,510 | Implemented |
GT0180 # 04 Y:1983 | 04 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,820 | $24,800 | Not Implemented |
GT0181 # 01 Y:1983 | 01 | 1983 | REDUCE LOAD ON ELECTRICAL CONDUCTOR TO REDUCE HEATING LOSSES | $20,000 | $28,000 | Not Implemented |
GT0181 # 02 Y:1983 | 02 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $10,422 | $9,000 | Not Implemented |
GT0181 # 03 Y:1983 | 03 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,800 | $65,900 | Not Implemented |
GT0181 # 04 Y:1983 | 04 | 1983 | OPTIMIZE PLANT POWER FACTOR | $5,360 | $12,000 | Not Implemented |
GT0181 # 05 Y:1983 | 05 | 1983 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,800 | $1,000 | Not Implemented |
GT0174 # 01 Y:1983 | 01 | 1983 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,771 | $49,000 | Not Implemented |
GT0174 # 02 Y:1983 | 02 | 1983 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $382 | $200 | Not Implemented |
GT0174 # 03 Y:1983 | 03 | 1983 | REPAIR AND ELIMINATE STEAM LEAKS | $334 | $100 | Not Implemented |
GT0174 # 04 Y:1983 | 04 | 1983 | INSULATE BARE EQUIPMENT | $225 | $133 | Not Implemented |
GT0174 # 05 Y:1983 | 05 | 1983 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $148 | $85 | Not Implemented |
GT0177 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $48,100 | $500 | Not Implemented |