Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0259 # 03 Y:2018 03 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $140,488 $304,000 Not Implemented
MZ0259 # 04 Y:2018 04 2018 RECOVER AND REUSE COOLING WATER $63,427 $203,000 Implemented
IC0209 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,273 $4,939 Implemented
IC0209 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,222 $11,728 Not Implemented
IC0209 # 03 Y:2018 03 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,608 $764 Not Implemented
IC0208 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,360 $0 Not Implemented
IC0208 # 02 Y:2018 02 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $18,213 $1,050 Not Implemented
IC0208 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,005 $9,970 Not Implemented
IC0208 # 04 Y:2018 04 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,442 $24,500 Not Implemented
IC0208 # 05 Y:2018 05 2018 REPLACE DIRECT FIRED WITH STEAM HEAT $12,205 $25,158 Not Implemented
IP0109 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,423 $0 Implemented
IP0109 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,107 $59 Implemented
IP0109 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $19,901 $2,251 Not Implemented
IP0109 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,301 $51,647 Implemented
IP0109 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $1,506 $1,246 Not Implemented
IP0109 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,342 $5,885 Implemented
IP0109 # 07 Y:2018 07 2018 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,448 $205,000 Not Implemented
IC0207 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,822 $7,531 Not Implemented
IC0207 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,473 $13,820 Not Implemented
IC0207 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,822 $290 Not Implemented
IC0207 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,736 $7,996 Not Implemented
MZ0257 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $2,925 Not Implemented
MZ0257 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $5,414 Not Implemented
MZ0257 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,472 $3,025 Not Implemented
MZ0257 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,225 $1,800 Implemented