Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
636
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0230 # 09 Y:2012 | 09 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,652 | $6,802 | Not Implemented |
MI0230 # 10 Y:2012 | 10 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,962 | $1,589 | Implemented |
MI0230 # 11 Y:2012 | 11 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,581 | $3,569 | Not Implemented |
MI0230 # 12 Y:2012 | 12 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,487 | $2,848 | Implemented |
MI0230 # 13 Y:2012 | 13 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,524 | $80 | Not Implemented |
MI0230 # 14 Y:2012 | 14 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,550 | $40 | Implemented |
MI0230 # 15 Y:2012 | 15 | 2012 | INSTALL OCCUPANCY SENSORS | $2,794 | $320 | Implemented |
MI0230 # 16 Y:2012 | 16 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,194 | $3,160 | Not Implemented |
MI0185 # 01 Y:2009 | 01 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $123,100 | $64,000 | Not Implemented |
MI0185 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $83,014 | $1,500 | Implemented |
MI0185 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,375 | $60 | Implemented |
MI0185 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,482 | $920 | Implemented |
MI0185 # 05 Y:2009 | 05 | 2009 | REPAIR OR REPLACE STEAM TRAPS | $12,330 | $800 | Implemented |
MI0185 # 06 Y:2009 | 06 | 2009 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,182 | $640 | Implemented |
MI0184 # 01 Y:2009 | 01 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $60,788 | $640 | Implemented |
MI0184 # 02 Y:2009 | 02 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $34,867 | $1,500 | Implemented |
MI0184 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,578 | $320 | Implemented |
MI0184 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,667 | $80 | Not Implemented |
MI0184 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,350 | $920 | Implemented |
MI0181 # 01 Y:2009 | 01 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $218,599 | $25,000 | Implemented |
MI0181 # 02 Y:2009 | 02 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $143,524 | $2,000 | Implemented |
MI0181 # 03 Y:2009 | 03 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,935 | $60,000 | Not Implemented |
MI0181 # 04 Y:2009 | 04 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $50,254 | $2,000 | Implemented |
MI0181 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,674 | $1,210 | Implemented |
MI0181 # 06 Y:2009 | 06 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,403 | $4,531 | Not Implemented |