IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,150

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0186 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,261 $500 Not Implemented
GT0187 # 01 Y:1983 01 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,140 $1,200 Not Implemented
GT0187 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,977 $22,034 Implemented
GT0187 # 03 Y:1983 03 1983 MODIFY DYE BECK $1,338 $600 Implemented
GT0187 # 04 Y:1983 04 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $14,618 $24,000 Implemented
GT0187 # 05 Y:1983 05 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,193 $500 Not Implemented
GT0187 # 06 Y:1983 06 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $2,160 $1,088 Not Implemented
GT0187 # 07 Y:1983 07 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $172 $138 Not Implemented
GT0188 # 01 Y:1983 01 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,723 $41,700 Not Implemented
GT0188 # 02 Y:1983 02 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $6,590 $1,440 Not Implemented
GT0188 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,399 $500 Not Implemented
GT0188 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,619 $1,842 Not Implemented
GT0182 # 01 Y:1983 01 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,190 $800 Not Implemented
GT0182 # 02 Y:1983 02 1983 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $910 $1,000 Not Implemented
GT0182 # 03 Y:1983 03 1983 ISOLATE HOT OR COLD EQUIPMENT $2,780 $1,520 Not Implemented
GT0182 # 04 Y:1983 04 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,200 $7,000 Not Implemented
GT0182 # 05 Y:1983 05 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,230 $8,940 Not Implemented
GT0183 # 01 Y:1983 01 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,660 $200 Implemented
GT0183 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,680 $11,600 Implemented
GT0183 # 03 Y:1983 03 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,850 $9,000 Implemented
GT0183 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $0 Not Implemented
GT0183 # 05 Y:1983 05 1983 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,100 $5,290 Not Implemented
GT0183 # 06 Y:1983 06 1983 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $580 $360 Implemented
GT0183 # 07 Y:1983 07 1983 INSTALL TIMERS AND/OR THERMOSTATS $2,200 $909 Implemented
GT0185 # 01 Y:1983 01 1983 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,050 $1,200 Not Implemented