IAC Assessment: GT0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product ENGINEERED PLASTICS
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 173
Plant Area (Sq.Ft.) 0
Annual Production 4,000,000 Pounds
Production Hrs. Annual 6,600
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $392,554 8,128,077 kWh $0.05
Natural Gas $53,072 10,031 MMBtu $5.29
TOTAL ENERGY COSTS $445,626
RECOMMENDED SAVINGS* $78,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$9,050
Cost:
$1,200
$1,800 36,928 - - $7,250 - $1,800
36,928
kWh
-
-
MMBtu
$7,250
-
$
02: 3.4151 MINIMIZE WATER USAGE Savings:
$8,324
Cost:
$3,000
$8,324 355,510 - - - - $8,324
355,510
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,683
Cost:
$4,700
$4,683 96,717 - - - - $4,683
96,717
kWh
-
-
MMBtu
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$11,993
Cost:
$9,000
$11,993 - - - - - $11,993
-
kWh
-
-
MMBtu
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$21,913
Cost:
$97,700
$21,913 453,693 - - - - $21,913
453,693
kWh
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,729
Cost:
-
$1,729 35,756 - - - - $1,729
35,756
kWh
-
-
MMBtu
-
-
$
07: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$11,340
Cost:
$9,000
- - $11,340 2,202 - - -
-
kWh
$11,340
2,202
MMBtu
-
-
$
08: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$9,548
Cost:
$8,200
- - $9,548 1,854 - - -
-
kWh
$9,548
1,854
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$78,580
Cost:
$132,800
$50,442 978,604 $20,888 4,056 $7,250 - $50,442
978,604
kWh
$20,888
4,056
MMBtu
$7,250
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes