IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0163 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $3,121 $3,655 Not Implemented
UD0476 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $1,000 Implemented
UD0476 # 02 Y:1995 02 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,648 $12,000 Implemented
UD0476 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,234 $15,045 Implemented
UD0476 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,633 $10,570 Implemented
UD0476 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $2,576 $1,920 Implemented
UD0476 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,376 $7,760 Implemented
UD0476 # 07 Y:1995 07 1995 DISCONNECT BALLASTS $673 $210 Implemented
UD0476 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,903 $3,290 Implemented
MS0044 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,849 $200 n/a
MS0044 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,785 $0 n/a
MS0044 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $593 $2,820 n/a
MS0044 # 04 Y:1995 04 1995 AIR CONDITION ONLY SPACE NECESSARY $11,011 $10,635 n/a
MS0044 # 05 Y:1995 05 1995 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $7,392 $7,500 n/a
MS0044 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $989 $760 n/a
MS0044 # 07 Y:1995 07 1995 REDUCE VENTILATION AIR $536 $200 n/a
MS0044 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $234 $202 n/a
ND0235 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $529 Implemented
ND0235 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55,146 $30,640 Implemented
ND0235 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $135 $0 Not Implemented
ND0235 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $28,611 $49,230 Not Implemented
ND0235 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,805 $600 Not Implemented
ND0235 # 06 Y:1995 06 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $399,646 $125,000 Implemented
ND0235 # 07 Y:1995 07 1995 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $15,000 $30,000 Implemented
ND0235 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,059 $1,500 Not Implemented