Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,642
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0230 # 07 Y:1987 | 07 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $605 | $90 | Not Implemented |
KU0230 # 08 Y:1987 | 08 | 1987 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $437 | $0 | Implemented |
KU0230 # 09 Y:1987 | 09 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $314 | $205 | Implemented |
KU0230 # 10 Y:1987 | 10 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $290 | $500 | Not Implemented |
KU0230 # 11 Y:1987 | 11 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $191 | $0 | Implemented |
KU0230 # 12 Y:1987 | 12 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $121 | $520 | Implemented |
KU0231 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,553 | $2,059 | Not Implemented |
KU0231 # 02 Y:1987 | 02 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $847 | $100 | Implemented |
KU0231 # 03 Y:1987 | 03 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $809 | $40 | Implemented |
KU0231 # 04 Y:1987 | 04 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $445 | $600 | Not Implemented |
KU0231 # 05 Y:1987 | 05 | 1987 | IMPROVE LUBRICATION PRACTICES | $424 | $600 | Implemented |
KU0231 # 06 Y:1987 | 06 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $212 | $120 | Implemented |
KU0231 # 07 Y:1987 | 07 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $211 | $0 | Implemented |
KU0231 # 08 Y:1987 | 08 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $132 | $250 | Not Implemented |
KU0231 # 09 Y:1987 | 09 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $-79 | $0 | Implemented |
KU0227 # 01 Y:1987 | 01 | 1987 | REDESIGN PROCESS | $8,861 | $5,000 | Not Implemented |
KU0227 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,771 | $4,019 | Implemented |
KU0227 # 03 Y:1987 | 03 | 1987 | INSULATE BARE EQUIPMENT | $1,447 | $700 | Not Implemented |
KU0227 # 04 Y:1987 | 04 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $1,030 | $0 | Implemented |
KU0227 # 05 Y:1987 | 05 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $667 | $275 | Not Implemented |
KU0227 # 06 Y:1987 | 06 | 1987 | COVER OPEN TANKS | $262 | $200 | Implemented |
KU0227 # 07 Y:1987 | 07 | 1987 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $125 | $0 | Implemented |
KU0227 # 08 Y:1987 | 08 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $152 | $290 | Implemented |
KU0228 # 01 Y:1987 | 01 | 1987 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $16,760 | $0 | Not Implemented |
KU0228 # 02 Y:1987 | 02 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,815 | $14,465 | Implemented |