Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0222 # 01 Y:2005 01 2005 ADD ADDITIONAL PRODUCTION SHIFT $96,000 $5,000 Not Implemented
LE0222 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,410 $49,000 Not Implemented
LE0222 # 03 Y:2005 03 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $5,760 $5,100 Not Implemented
LE0222 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,048 $2,000 Not Implemented
LE0222 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,793 $815 Not Implemented
LE0222 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,752 $200 Not Implemented
LE0222 # 07 Y:2005 07 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $7,800 Not Implemented
LE0222 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $480 Not Implemented
LE0222 # 09 Y:2005 09 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,823 $500 Not Implemented
LE0224 # 01 Y:2005 01 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $95,556 $262,000 Not Implemented
LE0224 # 02 Y:2005 02 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $35,540 $80,000 Not Implemented
LE0224 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $49,379 $10,700 Not Implemented
LE0224 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $28,953 $4,000 Not Implemented
LE0224 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $20,478 $22,000 Not Implemented
LE0224 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,329 $1,500 Not Implemented
LE0224 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,035 $300 Not Implemented
LE0224 # 08 Y:2005 08 2005 REDESIGN PROCESS $8,369 $500 Not Implemented
LE0224 # 09 Y:2005 09 2005 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $13,539 $12,000 Not Implemented
LE0224 # 10 Y:2005 10 2005 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,055 $520 Not Implemented
AM0497 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,000 $1,000 Implemented
AM0497 # 02 Y:2005 02 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,560 $0 Not Implemented
AM0497 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $3,030 $0 Implemented
AM0497 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,600 $0 Not Implemented
AM0497 # 05 Y:2005 05 2005 USE CONTINUOUS PROCESSING $2,500 $0 Not Implemented
AM0497 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,390 $1,270 Implemented