IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0518 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $44,220 $1,000 Implemented
AM0518 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,840 $2,500 Not Implemented
AM0518 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,000 $415 Implemented
AM0518 # 04 Y:2006 04 2006 REUSE RAGS UNTIL COMPLETELY SOILED $3,850 $0 Implemented
AM0518 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $500 Implemented
AM0518 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $280 $0 Implemented
WV0352 # 01 Y:2006 01 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,713 $170 Implemented
WV0352 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,003 $15,353 Not Implemented
WV0352 # 03 Y:2006 03 2006 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,862 $3,440 Implemented
WV0352 # 04 Y:2006 04 2006 DISCONNECT BALLASTS $1,803 $1,500 Implemented
WV0352 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,773 $1,431 Implemented
WV0352 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,241 $1,335 Implemented
WV0352 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $857 $25 Not Implemented
WV0352 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $857 $700 Not Implemented
WV0352 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $13 Not Implemented
WV0352 # 10 Y:2006 10 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $473 $325 Not Implemented
WV0352 # 11 Y:2006 11 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $460 $735 Not Implemented
WV0352 # 12 Y:2006 12 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $325 $38 Not Implemented
WV0351 # 01 Y:2006 01 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,565 $20,410 Implemented
WV0351 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,204 $480 Not Implemented
WV0351 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,324 $18,227 Not Implemented
WV0351 # 04 Y:2006 04 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,773 $3,473 Not Implemented
WV0351 # 05 Y:2006 05 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,122 $1,000 Implemented
WV0351 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,820 $14 Not Implemented
WV0351 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,042 $0 Implemented