IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0162 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $155,879 $298,500 Not Implemented
SD0162 # 05 Y:1997 05 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,408 $6,200 Implemented
SD0162 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,971 $2,200 Implemented
SD0162 # 07 Y:1997 07 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,597 $3,500 Implemented
SD0162 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,744 $150 Implemented
SD0162 # 09 Y:1997 09 1997 INSTALL OCCUPANCY SENSORS $866 $1,394 Implemented
SD0162 # 10 Y:1997 10 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $33,421 $31,250 Implemented
SD0162 # 11 Y:1997 11 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,430 $500 Implemented
SD0162 # 12 Y:1997 12 1997 USE AUTOMATIC CLEANING EQUIPMENT $50,117 $40,000 Not Implemented
SD0162 # 13 Y:1997 13 1997 USE AUTOMATIC CLEANING EQUIPMENT $38,115 $0 Implemented
SD0162 # 14 Y:1997 14 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $18,650 $11,000 Implemented
SD0162 # 15 Y:1997 15 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $26,004 $25,000 Implemented
SD0162 # 16 Y:1997 16 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,244,000 $3,448,800 Not Implemented
SD0162 # 17 Y:1997 17 1997 INCREASE USE OF AUTOMATION $219,089 $15,000 Implemented
AM0290 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $4,660 $920 Implemented
AM0290 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,310 $500 Implemented
AM0290 # 03 Y:1997 03 1997 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,100 $0 Implemented
AM0290 # 04 Y:1997 04 1997 USE SYNTHETIC LUBRICANT $2,130 $0 Implemented
AM0290 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,500 $300 Implemented
AM0290 # 06 Y:1997 06 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,300 $150 Implemented
AM0290 # 07 Y:1997 07 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $750 $0 Not Implemented
AR0109 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,064 $27 Not Implemented
AR0109 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,328 $250 Implemented
AR0109 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $346 $740 Implemented
AR0109 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $95 $0 Implemented